Not known Factual Statements About piling
The casing may increase to The complete depth or might terminate over the bond zone, With all the reinforcing bar continuing to the total depth.The standard of the link in between the central reinforcement, grout, and the sort of soil/rock establishes load bearing ability.Right after executing the First tremie grouting, strain grouting is concluded